SAN ANTONIO: 210.224.8841
AUSTIN: 512.687.3445
Client
Austin Independent School District
Architect
Responsibilities
MEP Engineering Services
Project Size
220,000 SF / 492 Car Spaces
Cost
$14.3 M
Project Completion
December 2016
Images courtesy of Page
Photography: Michael Bradford of HankNTank
Funded by the Austin ISD 2017 Bond Program and part the Bowie High School Modernization a three-level cast-in-place open parking garage with 492 parking spaces primarily for students, staff, and after school visitors.
A number of design features are included in the planning of the garage to simplify the internal circulation including increased drive aisle widths for young drivers and dedicated parking, entry and exit for students. A security office is located at the corner of the parking garage for visibility and monitoring of the parking garage.
The top level of the open parking garage is a designed for am eight court tennis deck with a shade canopy providing relief from the direct sun exposure.